Aqua extreme llc6/11/2023 An electrical engineer will ensure that all electrical components are safely wired according to code. Parts of the electrical phase may actually be interwoven throughout other phases, depending on the demands of the particular project. The plumbing trades ensure that the correct size and type of pipes are used in accordance with the aquatic consultant’s design ensuring no water velocity exceed 8 fps on the suction-side of the system and 6 fps on the pressure-side. Trenches will need to be excavated and shaded with sifted fill to house the pipes. Once the steel grid is in place, the plumbing technicians can get to work. Since the steel “cage” is custom-built at the site, the engineer can adapt to the unique shape of the pool, if applicable. The steel reinforcement lends greater strength to the pool. Structural Steel GridĪ structural steel grid is then assembled onsite. In extreme circumstances anyone, or combination of, helical piers, piles and grade beams may be required. If this occurs, the floor will be filled with the ideal type of soil and compacted. In some cases, the floor of the site may need to be excavated beyond the planned depth of the pool in order to account for settling and expansion. The engineer will plan the excavation to suit the soil conditions. The first step in the process is the excavation of the site (for those pools not on structure). However, the construction of every pool will follow the same general process. The construction may take several months, depending on the scale of the project, its features, and any unexpected challenges that may arise. When every detail is perfect and you’ve approved the final design, the construction process can begin. The design of a pool can be a lengthy process. Exploring the Phases of Pool Construction
0 Comments
Leave a Reply. |